Signatures signed for the Talas Anayurt tram line in Kayseri


Signatures have been signed for the Talas homeland tram line in Kayseri

The contract for the construction of the 5.5 kilometer tram line between Talas Mevlana Mahallesi and Furkan Doğan to be built by the Metropolitan Municipality of Kayseri was signed by Mayor Dr. It was signed by Memduh Büyükkılıç with the leaders of the contracting company. Mayor Büyükkılıç also announced the good news that the construction period of the 15 million 142 thousand 577 euro project had been withdrawn from 3 to 2 years and said: “May Allah not embarrass you. With the completion of these projects, our tram line will extend to 48 kilometers ”.

 Signatures have been signed for the Talas homeland tram line in Kayseri

Mayor of the Metropolitan Municipality Dr. Mamdouh Büyükkılıç’ın In addition, the previous year, the Minister of Economy and the Chairman of the Parliamentary Committee on Industry, Trade, Energy, Natural Resources, Information and Technology, Mustafa Elitaş, previously Minister of Energy and Natural Resources Taner Yildiz, Turkey- Ismail Ellis Karayel, Co-Chairman of the EU Joint Parliamentary Committee, Deputy Chairman of the Committee on Petitions and member of the committee for health, family, labor and social affairs İsmail Tamer, the mayor of Talas Mustafa Yalçın and the general manager of enterprises GÜLERMAK Alper Uzman and the technical director YDA Özcan Çakmak.

BÜYÜKKILIÇ: OUR LINE WILL COME TO LIFE IN 2 YEARS

Mayor Büyükkılıç, after signing the construction contract with the executives of the contracting company, wanted the tram line to be beneficial and said: “As we remember, we made our offer for the line of 30-kilometer tram on December 5.5. This offer has already been made, the signatures have been signed. The construction period of the project is estimated at 36 months, but we hope that our line will be implemented within 2 years. Good luck. May Allah Almighty not embarrass you. With the completion of these projects, our tram line will expand to 48 kilometers. In addition, the work of our multi-storey junction at the intersection of the tram and vehicles in our dormitory Şehit Furkan Doğan continues. It will be finished in about 7-8 months “

YALÇIN: FULL INVESTMENT

Former Minister of Energy and Natural Resources and AK Party MP Kayseri Taner Yıldız said: “Kayseri was a livable city, it becomes even more livable with this project, we congratulate your whole team”, and the mayor of Talas, Mustafa Yalçın, said: “One of the most precise decisions. This. The busiest district of Kayseri with a population of 80,000 was Mevlana district. The fact that this project is carried out with the determination of our president of Memduh is a perfectly precise investment. don’t embarrass yourself. “

COMFORTABLE AND COMFORTABLE TRANSPORTATION FOR UNIVERSITY STUDENTS

With the completion of this project, it is planned to connect the Homeland of Talas, which is one of the important institutions for the students of Erciyes University, with the university by the railway system. In this way, it is expected that those with access to the university can travel comfortably and safely. With the introduction of the rail system, as a result of the planning of bus routes, the integrated operation of the two public transportations will reduce the number of road vehicles coming from the regions of the homeland to the university. The Kayseri urban rail transport system is connected to the 5th stage of Şehit Furkan Doğan station and has 5.5 passenger stations along the approximately 9 kilometer journey to Talas Anayurt area, 3 wells and underground deposits, water reservoirs and 3 processing centers. An additional rail system line will be built, including electromechanical works.


Source link

Previous Syrian mother asks for help as her child risks losing his sight
Next "Return to Palmyra" celebrates the heritage of the ancient Syrian city

No Comment

Leave a reply

Your email address will not be published. Required fields are marked *